Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Arboleda, C A and Abraham, D M (2004) Fatalities in Trenching Operations—Analysis Using Models of Accident Causation. Journal of Construction Engineering and Management, 130(02), 273–80.

Barker, R, Childerhouse, P, Naim, M, Masat, J and Wilson, D (2004) Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(02), 177–87.

Chan, A P C, Chan, D W M, Chiang, Y H, Tang, B S, Chan, E H W and Ho, K S K (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(02), 188–98.

Choi, H, Cho, H and Seo, J W (2004) Risk Assessment Methodology for Underground Construction Projects. Journal of Construction Engineering and Management, 130(02), 258–72.

  • Type: Journal Article
  • Keywords: Risk analysis; Uncertainty principles; Fuzzy sets; Underground construction; risk analysis; construction; fuzzy systems; accidents; civil engineering; surveying; safety;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(258)
  • Abstract:
    This paper presents a risk assessment methodology for underground construction projects. A formalized procedure and associated tools were developed to assess and manage the risks involved in underground construction. The suggested risk assessment procedure is composed of four steps of identifying, analyzing, evaluating, and managing the risks inherent in construction projects. The main tool of the proposed risk assessment methodology is the risk analysis software. The risk analysis software is built upon an uncertainty model based on fuzzy concept. The fuzzy-based uncertainty model is designed to consider the uncertainty range that represents the degree of uncertainties involved in both (1) probabilistic parameter estimates and (2) subjective judgments. Other tools developed in this study include the survey sheets for collecting risk-related information and the detail check sheets for risk identification and analysis. The paper finally discusses a detailed case study of the developed risk assessment methodology performed for a subway construction project in Korea.

Hadikusumo, B H W and Rowlinson, S (2004) Capturing Safety Knowledge Using Design-for-Safety-Process Tool. Journal of Construction Engineering and Management, 130(02), 281–9.

Hegazy, T, Elhakeem, A and Elbeltagi, E (2004) Distributed Scheduling Model for Infrastructure Networks. Journal of Construction Engineering and Management, 130(02), 160–7.

Jeong, H S, Abraham, D M and Lew, J J (2004) Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management, 130(02), 225–34.

Lingard, H (2004) Work and Family Sources of Burnout in the Australian Engineering Profession: Comparison of Respondents in Dual- and Single-Earner Couples, Parents, and Nonparents. Journal of Construction Engineering and Management, 130(02), 290–8.

Lu, M and Anson, M (2004) Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Journal of Construction Engineering and Management, 130(02), 216–24.

Sacks, R, Eastman, C M and Lee, G (2004) Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(02), 206–15.

Shohet, I M and Perelstein, E (2004) Decision Support Model for the Allocation of Resources in Rehabilitation Projects. Journal of Construction Engineering and Management, 130(02), 249–57.

Stewart, J, Minchin, R E, Jaselskis, E J, Dayal, V and Smith, G (2004) Potential Construction Applications for Thermoset Composite Scrap Material. Journal of Construction Engineering and Management, 130(02), 199–205.

Zhang, X (2004) Concessionaire Selection: Methods and Criteria. Journal of Construction Engineering and Management, 130(02), 235–44.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2004) Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Journal of Construction Engineering and Management, 130(02), 168–76.

Zwick, D C and Miller, K R (2004) Project Buyout. Journal of Construction Engineering and Management, 130(02), 245–8.